Financing Options Are Now Available! 12 - 60 Month Terms

Call Us: 330-286-0526

Shipping Containers for Manufacturing and Industrial Facilities

Overflow storage and equipment housing for manufacturing plants and industrial facilities. Delivered nationwide with freight included.

Used 20ft containers run $2,000 to $3,800 delivered, and used 40ft run $2,800 to $4,500, with freight included in the ZIP code price. New 1-Trip units run $3,500 to $5,500 for a 20ft and $4,500 to $7,500 for a 40ft. Standard units ship in 5 to 10 business days from the depot nearest your facility. Orders of three or more units go through the bulk desk for volume pricing and phased delivery.

We have sold containers for over 35 years and served more than 70,000 customers, including manufacturers who need overflow storage and equipment housing that scales with production rather than a warehouse lease that doesn't. We sell rather than rent, so the unit stays on your plant floor or yard as a permanent asset instead of a recurring facilities cost. If you are still working out what your plant needs, our commercial buyer's guide covers sizing and configuration by use case in detail.

Why Manufacturers Buy From Us

Delivered Price Includes Freight

300+ Depot Locations

Volume Pricing on 3+ Units

Enter a plant ZIP code and see the all-in delivered price. Pricing reflects the five nearest depots, so the quote returned is the lowest available for that address.

We dispatch from the depot nearest each facility, which keeps delivery cost down for manufacturers running plants across several markets.

Three or more units on one purchase order get volume pricing, phased delivery, and multi-address dispatch across plants.

Containers for Plant and Facility Storage

Four configurations cover most manufacturing and industrial requirements: the 20ft WWT for tool and spare parts storage, the 40ft WWT for larger overflow and raw material staging, the 40ft High Cube where taller equipment needs headroom, and a New 1-Trip unit as the base for a plant office. All prices include delivery to your ZIP code.

Product

Delivered Price

Plant Use

20ft Wind and Water Tight

$2,000 to $3,800

Tool and spare parts storage for a single line

40ft Wind and Water Tight

$2,800 to $4,500

Overflow storage and raw material staging

40ft High Cube WWT

$2,800 to $4,500

Tall equipment and palletized material storage

20ft New 1-Trip

$3,500 to $5,500

Plant office base and client-facing placements

40ft New 1-Trip

$4,500 to $7,500

Premium plant office or engineering trailer replacement

Container Office

Quoted

Ready-built plant office, fitted before dispatch

Roll-Up Door Storage Unit

Quoted

Forklift-ready daily access for pallets and material

Plant and Facility Accessories

Five additions cover the standard plant build: a roll-up door for forklift and pallet access, shelving for spare parts and small components, a lock box for security, vents to prevent condensation on stored material, and an office kit where the unit serves as a plant office. All are available on the same order and covered by one financing agreement.

Accessory

Plant Function

Roll-Up Door

Full-width access for pallets and material without cargo door swing clearance

Shelving Package

Organizes spare parts and small-component storage. Confirm current build spec with the bulk desk.

Lock Box

Shrouds the padlock so bolt cutters cannot reach the shackle

Container Vents

Prevents condensation from damaging stored parts and raw material

Office Kit

Core plant office fit-out supplied as one package

Accessories cannot be added to a financing agreement after an order is placed, so specify the full package at checkout. The complete range is on the container accessories collection.

Configurations by Operation Size

Configuration drives both unit count and order route. One or two units go through standard online checkout. Three or more move to the bulk desk, where volume pricing, phased delivery, and multi-address dispatch apply.

Operation

Units

Configuration

Modifications

Order Route

Small shop, single line

1

20ft WWT

Lock box, shelving

Online checkout

Mid-size manufacturer

1 to 2

40ft WWT

Roll-up door, shelving

Online checkout

Multi-line facility

2 to 3

40ft mix plus office

Roll-up doors, office kit

Bulk desk

Multi-building plant campus

3 to 4

Standardized 40ft spec

Uniform spec, all buildings

Bulk desk

Regional manufacturer

4 to 6

40ft mix plus office

Shelving, office kit

Bulk desk

Multi-plant industrial group

5 to 8

40ft mix plus office

Office kit, secure store

Bulk desk

Standardizing Specification Across a Multi-Plant Group

Manufacturers running several plants get the most value from a single standardized specification held on file.

One spec across every plant means maintenance and operations staff moving between facilities already know the layout, replacement parts and keys are interchangeable, and reordering for the next expansion is a phone call rather than a fresh configuration exercise.

It also improves the quote. A standardized multi-unit order dispatched from several depots to several plants is efficient for us to fulfil, and that efficiency comes back in the pricing.

Running more than three active facilities? Call (330) 286-0526 and ask the bulk desk to set up a program specification.

Pricing

All prices include delivery to your ZIP code with no separate freight charge. Pricing reflects the five nearest depot locations, so the quote returned is the lowest available rate for that address. Facilities near an industrial corridor typically price lower than remote sites.

Container

Used Grades

New 1-Trip

Notes

20ft Standard

$2,000 to $3,800

$3,500 to $5,500

WWT is the standard plant storage grade

40ft Standard

$2,800 to $4,500

$4,500 to $7,500

Best value per square foot for overflow storage

40ft High Cube

$2,800 to $4,500

$4,500 to $7,500

Preferred for tall equipment and palletized material

Used grades cover Multi-Trip, Wind and Water Tight, Cargo Worthy, and AS-IS, with WWT being the standard plant specification. 

Bulk and Multi-Plant Ordering

Bulk Order Desk: Three or More Units
  Volume pricing across the order rather than per-unit list pricing.
  Phased delivery so units arrive as each plant becomes ready.
  Multi-address dispatch drawn from the depot nearest each site.
  A standardized specification held on file for fast reordering.
  A single agreement covering the full order including modifications.

Call (330) 286-0526 and ask for the bulk desk, or email [email protected] with your plant list and unit count.

Payment, Financing, and Section 179

Four payment routes are available: 

  • Card or ACH for immediate purchase.
  • Clicklease equipment financing over 12 to 60 months with a 60-second approval and a soft credit pull.
  • Affirm at checkout for shorter terms.
  • Pay-on-delivery for qualifying addresses where the unit is inspected before payment clears.

Containers purchased for business use may qualify as Section 179 depreciable assets, allowing the purchase cost to be deducted in the year of acquisition rather than depreciated across several years. Treatment depends on your business circumstances and should be confirmed with your tax advisor. Full payment terms are on the financing options page.

Modifications ordered with the container are covered by the same financing agreement, which is why the full package should be specified up front rather than added afterwards.

Procurement, Purchase Orders, and Vendor Setup

We supply manufacturers and industrial facility owners that purchase through formal procurement. Purchase orders, vendor onboarding documentation, W-9 requests, certificates of insurance, and tax-exempt purchases are handled through the bulk desk rather than standard checkout.

  • Purchase Orders: Accepted on qualifying accounts. Contact the bulk desk before raising the PO so the specification and delivered pricing are confirmed first.
  • Vendor Setup: We can complete standard vendor onboarding packs and supply a W-9 on request.
  • Certificates of Insurance: Available on request where a plant safety office requires one before delivery.
  • Tax-exempt Purchases: Supply your exemption certificate at order so the invoice is raised correctly.
  • Consolidated Invoicing: Multi-plant orders can be invoiced as a single document or split by facility.

Bringing procurement into the conversation early avoids the common delay where a specification is agreed, a PO is raised against the wrong figure, and the order has to be reworked. Call (330) 286-0526 before the PO is issued.

Lead Times

Standard containers ship in 5 to 10 business days from order confirmation. Modified units take longer because modification work is completed before the container leaves our facility. If you have a fixed line expansion or plant opening date, confirm lead time with us before ordering rather than after.

Order Type

Lead Time

Notes

Standard container, no modifications

5 to 10 business days

Dispatched from the depot nearest your facility

Container with roll-up door or shelving

Longer than standard

Modification completed before dispatch

Office kit or full fit-out

Longer than standard

Confirm against your plant schedule at order

Multi-unit with phased delivery

Scheduled to your program

Units arrive as each facility becomes ready

Delivery is by tilt-bed truck. The site needs 12 feet of access width, 60 feet of clear run-out at the drop point, 14 feet of overhead clearance, and firm level ground. Plant yard access and shift scheduling should be confirmed with facilities staff before the drop so it does not conflict with active production or shipping activity.

Inspection and Warranty

Every container is inspected before dispatch and again at delivery, with the condition record reviewed with you at the point of handover. New 1-Trip units carry a 10-year structural and 10-year no-leak warranty. Used grades carry shorter terms, which are confirmed at the point of order.

Pay-on-delivery is available for qualifying addresses, which means the container is placed and inspected on your site before payment clears. For manufacturers buying from a supplier for the first time, this removes the risk that the unit delivered does not match the grade ordered. The process is documented on the container inspection process page.

Frequently Asked Questions

Do you offer volume pricing on multiple containers for a manufacturing group?

Yes. Orders of three or more units go through the bulk desk, which applies volume pricing across the order rather than per-unit list pricing. Phased delivery and multi-address dispatch across plants are included. Call (330) 286-0526 with your plant list and unit count.

Can I pay by purchase order?

Purchase orders are accepted on qualifying accounts. Contact the bulk desk before raising the PO so the specification and delivered pricing are confirmed first, which avoids the PO being raised against a figure that then has to be amended.

Can you supply a W-9 and complete vendor onboarding for a manufacturer?

Yes. We can complete standard vendor onboarding documentation and supply a W-9 on request. Certificates of insurance are also available where a plant safety office requires one before delivery.

Do you handle tax-exempt purchases?

Yes. Supply your exemption certificate at the point of order so the invoice is raised correctly from the outset. Amending an invoice after issue is slower than applying the exemption at order.

Can one order be delivered to several different plants?

Yes. Multi-address dispatch is standard on bulk orders, and each unit is drawn from the depot nearest its destination plant rather than shipping everything from one origin. Delivery can be phased so units arrive as each facility becomes ready.

Is delivery included in the price?

Yes. Every price shown includes delivery to your ZIP code with no separate freight charge, and pricing reflects the five nearest depots so the figure returned is the lowest available for that address. Full pricing detail is in our 2026 price breakdown.

What is the lead time on a modified container for a plant office?

Longer than the 5 to 10 business days a standard unit takes, because modification work is completed before the container leaves our facility. If you are working to a fixed plant schedule, call (330) 286-0526 to confirm lead time against that date before ordering.

Can I inspect the container before paying?

Pay-on-delivery is available for qualifying addresses, which places and inspects the unit on your site before payment clears. Every container is also inspected before dispatch and again at delivery, with the record reviewed at handover. See the inspection process page.

What warranty comes with the container?

New 1-Trip units carry a 10-year structural and 10-year no-leak warranty. Used grades carry shorter terms, confirmed at point of order. Warranty terms are grade-specific rather than uniform across the range.

Can accessories be added after the order is placed?

Not to an existing financing agreement. Accessories bought later are a separate transaction outside the original agreement, which is why the full package should be specified at checkout. The range is on the accessories collection.

Working out what your plant actually needs before you buy? Our commercial buyer's guide covers sizing and configuration for equipment housing and overflow storage use cases.

Get a Delivered Quote for Your Plant.

Enter your facility ZIP code for an all-in delivered price with freight included. Running more than one plant, or purchasing through procurement? Call the bulk desk for volume pricing, phased delivery, multi-address dispatch, and purchase order handling.

Get My Instant Quote  |  Bulk Desk: (330) 286-0526

Current Location

Deliver to

Update your delivery location and get an instant quote.